SIMAC POWDER COMPACTING PRESSES
REQUEST FOR QUOTATION QUESTIONNAIRE
(TO BE USED FOR ISOSTATIC PRESSES, AND PROCESS EQUIPMENT.)
COMPANY __________________________________________________ DATE __________________
ADDRESS __________________________________________________ PHONE _________________
COUNTRY EQUIPMENT WILL BE USED IN _________________________ FAX ____________________
NAME OF CONTACT & TITLE _______________________________________ REF. NO. ________
The following application information is necessary to enable us to process your quotation request for
a press, tooling, or samples. Please complete all items which apply to your requirements and return
this form and drawing(s) to us.
Part (I) Equipment
(1) Description of part. ____________________________________________________________
_________________________________________________________________________________
(2) Dimensions of the "as pressed" part including tolerances. _______________________
_________________________________________________________________________________
Part (II) Material Details:
(1) Type of material? _______________________________________________________________
_________________________________________________________________________________
(2) Preparation process (e.g spray dried ect.)? _____________________________________
_________________________________________________________________________________
(3) Bulk (free pour) density (gms/cm)? ______________________________________________
(4) Pressed density (gms/cm)? _______________________________________________________
(5) Pressing pressure (bar)? ________________________________________________________
(6) Particle size distribution? _____________________________________________________
(7) Sintering shrinkage (%)? ________________________________________________________
(8) Can a sample of material be supplied? ___________________________________________
Note: Health and safety (MSDS) information will be required with sample material.
Part (III) Material:
(1) Present method of production (where applicable) _________________________________
(2) Annual output required? _________________________________________________________